HOF announces its MLT FOUR, which celebrates its world premiere at ISE 2025.
The new MLT FOUR is the logical further development of the MLT Pre Rig Truss Series. With its 80cm height, the MLT FOUR is designed as a Pre Rig Truss for heavy loads and large spans. It is ideal for holding and flexibly positioning motors without losing height.
This distinguishes the MLT FOUR from the MLT THREE and TWO Pre Rig Trusses, which are the right choice when little headroom is available and the number of hanging points is not limited. The MLT FOUR, on the other hand, is the choice when you need to create a typical pre-rig and bridge a large span, but only have a limited number of hanging points.
The main features of the new MLT FOUR are high load capacity, heavy-duty rail system
and stackable.
The MLT FOUR is available in lengths of 2.4m and 3m. As with the other MLT Pre Rig Trusses from HOF, the new MLT FOUR has a complete range of accessories such as the heavy-duty rail system including runner, the protection cover, the distance holder, the forklift adapter and many more.